DC Water extends public comment period for proposed System Availability Fee

February 24, 2016

DC Water is extending the public comment period for the proposed System Availability Fee (SAF) on new construction and renovation projects in the District of Columbia. The proposed rules were published in the District of Columbia Register (DCR) on January 22, 2016 (63 DCR 000918). The original thirty (30) day public comment period, scheduled to end on February 22, 2016, is being extended to March 11, 2016. All comments received by Friday, March 11, 2016 will be considered. More information on the proposed fee can be found on DC Water's website at https://www.dcwater.com/permits.

Comments on these proposed rules should be submitted, in writing, no later than March 11, 2016 to, Linda R. Manley, Secretary to the Board, District of Columbia Water and Sewer Authority, 5000 Overlook Ave., S.W., Washington, D.C. 20032, or by email to Lmanley@dcwater.com. A copy of the proposed rulemaking is available at the URL below. Copies of these proposed rules may also be obtained from DC Water at the same mailing address.

https://www.dcwater.com/customercare/rule_making/nopr_system_availabili…

Latest News

Picture of frozen water pipes with icicles hanging off of them

With December getting off to a near-record cold start now is the time to act. Winter weather can bring risks like frozen pipes, water main breaks, and other emergencies that can disrupt your water service. Don’t wait for something to happen. DC Water encourages customers to prepare now and know what to do if the unexpected happens.

Worker on side of steep slope

TRAFFIC ADVISORY - CLEAN RIVERS - POTOMAC RIVER TUNNEL PROJECT

DC Water is in the final stretch of its slope stabilization project along Canal Road NW, a critical project that will pave the way for Potomac River Tunnel construction at this site. Beginning, the week of December 15, 2025, one westbound lane of Canal Road will be closed during daytime, off-peak hours on weekdays and Saturdays to hydroseed the slope.

Image of Wendy with EPA Letter

DC Water is reaching out to nearly 25,000 customers this month with important information about the material of their water service lines. These annual notifications are part of DC Water’s ongoing commitment to prevent exposure to lead and remove lead service lines from the District’s drinking water system through the Lead Free DC initiative.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Worker on side of steep slope
Canal Road Slope Stabilization Project Nears End; Off-peak Lane Closure to Replant Slope

TRAFFIC ADVISORY - CLEAN RIVERS - POTOMAC RIVER TUNNEL PROJECT

DC Water is in the final stretch of its slope stabilization project along Canal Road NW, a critical project that will pave the way for Potomac River Tunnel construction at this site. Beginning, the week of December 15, 2025, one westbound lane of Canal Road will be closed during daytime, off-peak hours on weekdays and Saturdays to hydroseed the slope.

Latest Blog Post
A helicopter lowers a drill rig to workers on the Potomac River.
DC Water begins drilling in Potomac River to explore options to rehab underwater sewer line
When one of your major sewer lines runs through the Potomac River, a backhoe and trencher won't do. That's why we've got helicopters carrying a 14-ton drill and workers suspended midair over the Potomac.
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 40% of the last 3 payments made and in the new fiscal year 50% will be credited. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.