Our Pledge to Keep District Drinking Water Safe

February 05, 2009

The Jan. 27 front-page story "High Lead Levels Found in D.C. Kids" raised renewed concerns about lead levels in D.C. water between 2001 and 2003. As the new chairman of the D.C. Water and Sewer Authority (WASA) and the father of a child born in 2002, I take this study and the quality of the Districts water very seriously.
What people should know first and foremost is that D.C. drinking water is safe and meets or exceeds all federal safety standards.
The WASA board and management team are deeply concerned about public health and safety, particularly as it relates to the communitys children. The agencys most important job is to provide clean, quality drinking water, and we view that job as a solemn trust.
WASA relies on federal regulatory agencies, including the Environmental Protection Agency, to set water standards, and it operates under all requirements of the Safe Drinking Water Act. It also relies on the D.C. Health Department and other independent organizations to provide health expertise and direction.
The report that was at the center of the Jan. 27 article disagrees with earlier reports from epidemiologists, including one by the federal Centers for Disease Control and Prevention. The lead author of the latest study, conducted by researchers at Virginia Tech and Childrens National Medical Center, is not an epidemiologist. At this point, we cant assess the scientific merit of the methodology used in the study, how much peer review it received and how valid its conclusions are.
However, the study makes claims that WASA takes very seriously. As a result, we have asked independent experts to review the study and explain the discrepancies in conclusions made in this study and earlier reports from the D.C. Health Department and the Centers for Disease Control.
I have just been confirmed as chairman of WASA and was not involved with the agency during the period covered by the study that The Post reported on. I can assure the public that WASA will provide them with a full accounting of what we find in reexamining the research on lead in the Districts water.
Clearly, no one of any age in the area should ever be placed at risk of exposure to lead. But I would like WASA customers to know: Your water is safe to drink, and WASA is watching out for your health and well-being and that of your children. Please remember, they are our children, too.

Latest News

Picture of frozen water pipes with icicles hanging off of them

With December getting off to a near-record cold start now is the time to act. Winter weather can bring risks like frozen pipes, water main breaks, and other emergencies that can disrupt your water service. Don’t wait for something to happen. DC Water encourages customers to prepare now and know what to do if the unexpected happens.

Worker on side of steep slope

TRAFFIC ADVISORY - CLEAN RIVERS - POTOMAC RIVER TUNNEL PROJECT

DC Water is in the final stretch of its slope stabilization project along Canal Road NW, a critical project that will pave the way for Potomac River Tunnel construction at this site. Beginning, the week of December 15, 2025, one westbound lane of Canal Road will be closed during daytime, off-peak hours on weekdays and Saturdays to hydroseed the slope.

Image of Wendy with EPA Letter

DC Water is reaching out to nearly 25,000 customers this month with important information about the material of their water service lines. These annual notifications are part of DC Water’s ongoing commitment to prevent exposure to lead and remove lead service lines from the District’s drinking water system through the Lead Free DC initiative.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Worker on side of steep slope
Canal Road Slope Stabilization Project Nears End; Off-peak Lane Closure to Replant Slope

TRAFFIC ADVISORY - CLEAN RIVERS - POTOMAC RIVER TUNNEL PROJECT

DC Water is in the final stretch of its slope stabilization project along Canal Road NW, a critical project that will pave the way for Potomac River Tunnel construction at this site. Beginning, the week of December 15, 2025, one westbound lane of Canal Road will be closed during daytime, off-peak hours on weekdays and Saturdays to hydroseed the slope.

Latest Blog Post
A helicopter lowers a drill rig to workers on the Potomac River.
DC Water begins drilling in Potomac River to explore options to rehab underwater sewer line
When one of your major sewer lines runs through the Potomac River, a backhoe and trencher won't do. That's why we've got helicopters carrying a 14-ton drill and workers suspended midair over the Potomac.
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 40% of the last 3 payments made and in the new fiscal year 50% will be credited. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.