PUBLIC MEETING ON PROJECTS TO CONTROL COMBINED SEWER OVERFLOWS TO THE ANACOSTIA RIVER

September 16, 2009

Who: The District of Columbia Water and Sewer Authority (DC WASA) invites citizens, employees and interested parties in the District of Columbia to this public meeting

What: Public meeting on the projects to control combined sewer overflows to the Anacostia River

When: September 17, 2009 — 6:00 p.m.

Where: Washington Highlands Library, 115 Atlantic Avenue, SW

Background:
DC WASA is implementing a Long Term Control Plan (LTCP) to control combined sewer overflows (CSOs) to the Anacostia and Potomac Rivers and Rock Creek. The Authority is preparing an Environmental Information Document (EID) for Anacostia River CSO Control Projects located between the Authority’s advanced wastewater treatment plant at Blue Plains and RFK Stadium.

# # #

About The District of Columbia Water and Sewer Authority
The District of Columbia Water and Sewer Authority (DC WASA) is an industry-leading authority of District government that provides drinking water and wastewater collection and treatment for a population of more than 500,000 in the District of Columbia. DC WASA also treats wastewater for a population of 1.6 million in Montgomery and Prince Georges counties in Maryland, and Fairfax and Loudoun counties in Virginia. The Authority operates the world’s largest advanced wastewater treatment plant, with a capacity of 370 million gallons per day and a peak daily capacity of more than a billion gallons. DC WASA’s service area covers approximately 725 square miles.

Latest News

Picture of frozen water pipes with icicles hanging off of them

With December getting off to a near-record cold start now is the time to act. Winter weather can bring risks like frozen pipes, water main breaks, and other emergencies that can disrupt your water service. Don’t wait for something to happen. DC Water encourages customers to prepare now and know what to do if the unexpected happens.

Worker on side of steep slope

TRAFFIC ADVISORY - CLEAN RIVERS - POTOMAC RIVER TUNNEL PROJECT

DC Water is in the final stretch of its slope stabilization project along Canal Road NW, a critical project that will pave the way for Potomac River Tunnel construction at this site. Beginning, the week of December 15, 2025, one westbound lane of Canal Road will be closed during daytime, off-peak hours on weekdays and Saturdays to hydroseed the slope.

Image of Wendy with EPA Letter

DC Water is reaching out to nearly 25,000 customers this month with important information about the material of their water service lines. These annual notifications are part of DC Water’s ongoing commitment to prevent exposure to lead and remove lead service lines from the District’s drinking water system through the Lead Free DC initiative.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Worker on side of steep slope
Canal Road Slope Stabilization Project Nears End; Off-peak Lane Closure to Replant Slope

TRAFFIC ADVISORY - CLEAN RIVERS - POTOMAC RIVER TUNNEL PROJECT

DC Water is in the final stretch of its slope stabilization project along Canal Road NW, a critical project that will pave the way for Potomac River Tunnel construction at this site. Beginning, the week of December 15, 2025, one westbound lane of Canal Road will be closed during daytime, off-peak hours on weekdays and Saturdays to hydroseed the slope.

Latest Blog Post
A helicopter lowers a drill rig to workers on the Potomac River.
DC Water begins drilling in Potomac River to explore options to rehab underwater sewer line
When one of your major sewer lines runs through the Potomac River, a backhoe and trencher won't do. That's why we've got helicopters carrying a 14-ton drill and workers suspended midair over the Potomac.
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 40% of the last 3 payments made and in the new fiscal year 50% will be credited. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.