Traffic Advisory: Road closed for Sewer Main repair on Anacostia Ave Northeast

July 20, 2025

DC Water is advising motorists of a road closure in the 1500 block of Anacostia Avenue Northeast, at the intersection with Ponds Street due to a sewer main repair. The location is adjacent to Kenilworth Aquatic Gardens and may restrict vehicle access to the parking lot pending further assessment.

The road closure is necessary, due to a failure in the 108-inch sewer pipe that has created a large void around the line. The soil conditions have also compromised a 70-80 foot oak tree above the pipe that is now in danger of falling.

DC Water is assessing the extent of the failure to determine the scope of work necessary for repairs. The road will remain closed pending further evaluation. Motorists are encouraged to avoid the area, and use Douglas and Quarles streets via Kenilworth Avenue to detour around the road closure.

At this time the sewer line remains operational with limited flow, and no sewage has spilled from the pipe. DC Water crews will continue to monitor the situation and effort repairs as soon as possible.

If you have additional questions or need information you may contact DC Water’s Customer Care team at (202) 354-3600 (Monday-Friday, 8 a.m. to 5 p.m.) or the 24-Hour Command Center at 202-612-3400.

Latest News

Picture of frozen water pipes with icicles hanging off of them

With December getting off to a near-record cold start now is the time to act. Winter weather can bring risks like frozen pipes, water main breaks, and other emergencies that can disrupt your water service. Don’t wait for something to happen. DC Water encourages customers to prepare now and know what to do if the unexpected happens.

Worker on side of steep slope

TRAFFIC ADVISORY - CLEAN RIVERS - POTOMAC RIVER TUNNEL PROJECT

DC Water is in the final stretch of its slope stabilization project along Canal Road NW, a critical project that will pave the way for Potomac River Tunnel construction at this site. Beginning, the week of December 15, 2025, one westbound lane of Canal Road will be closed during daytime, off-peak hours on weekdays and Saturdays to hydroseed the slope.

Image of Wendy with EPA Letter

DC Water is reaching out to nearly 25,000 customers this month with important information about the material of their water service lines. These annual notifications are part of DC Water’s ongoing commitment to prevent exposure to lead and remove lead service lines from the District’s drinking water system through the Lead Free DC initiative.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Worker on side of steep slope
Canal Road Slope Stabilization Project Nears End; Off-peak Lane Closure to Replant Slope

TRAFFIC ADVISORY - CLEAN RIVERS - POTOMAC RIVER TUNNEL PROJECT

DC Water is in the final stretch of its slope stabilization project along Canal Road NW, a critical project that will pave the way for Potomac River Tunnel construction at this site. Beginning, the week of December 15, 2025, one westbound lane of Canal Road will be closed during daytime, off-peak hours on weekdays and Saturdays to hydroseed the slope.

Latest Blog Post
A helicopter lowers a drill rig to workers on the Potomac River.
DC Water begins drilling in Potomac River to explore options to rehab underwater sewer line
When one of your major sewer lines runs through the Potomac River, a backhoe and trencher won't do. That's why we've got helicopters carrying a 14-ton drill and workers suspended midair over the Potomac.
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 40% of the last 3 payments made and in the new fiscal year 50% will be credited. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.